How much does a concrete driveway cost in Southern California?
A plain breakdown of what moves the price of a new concrete driveway in Southern California, with ballpark ranges and the questions a good quote should answer.
By Jose Rubalcava · 2 min read
Most homeowners asking about a driveway want one number. The honest answer is a range, and the range depends on four things: how big the slab is, what is under it, what finish you want, and what has to be torn out first.
Where the money goes
A standard two-car driveway runs about 400 to 600 square feet. For plain, broom-finished concrete in Southern California, you are usually looking at somewhere between $9 and $15 per square foot installed. That puts a typical driveway in the $4,000 to $9,000 range before extras. Stamped or colored concrete adds a good amount on top, often 40 to 50 percent, because the finish takes more material and more hours.
Demo of the old driveway is the most common extra. Breaking out and hauling away an old slab is real work and real dump fees. If the old concrete is cracked and heaved, a thicker base or added rebar may be part of the job too.
What a good quote should tell you
- The thickness of the slab. Four inches is standard for a residential driveway; some situations call for more.
- What the base is made of and how it is compacted.
- Whether there is rebar or wire mesh in the pour.
- Where the control joints go. Joints are where concrete is supposed to crack, so it does not crack somewhere else.
- How the slab drains. Water should run away from the house and the garage, every time.
If a quote does not cover those, ask. The cheapest driveway is the one you only pay for once.
A faster way to a ballpark
The cost calculator on this site takes the size and the finish and gives you a rough range in a few seconds. It is a planning tool, not a bid. For a real number, start a free quote and Jose will come look at the job.
Questions
Questions
How thick should a concrete driveway be?
Four inches is standard for cars and light trucks. Heavier vehicles or soft ground can call for more. The quote should say what you are getting.
How long before I can park on a new driveway?
You can usually walk on it after a day or two. Keep cars off for about a week, and give it a full month to reach full strength.